ADDENDUM NO. 4 Alhambra High School Building J HVAC Replacement Project Martinez Unified School District Martinez, California December 15, 2025 This addendum shall supersede all previously issued specifications, addenda, and drawings wherein this addendum contradicts previously issued documents. All other conditions remain unchanged. The following changes, modifications, corrections, clarifications, and / or additions as set forth herein shall apply to the above documents and shall be made a part thereof and shall be subject to all the requirements thereof as though originally specified and / or shown. QUESTIONS/CLARIFICATIONS 1.01 Could you advise of the existing manufacturer for the FA System in the building? The existing fire alarm system in Building J is Silent Knight by Honeywell. END OF ADDENDUM NO. 4 RFP – Alhambra High School Building J HVAC Replacement Project, MUSD ADDENDUM NO. 4 December 15, 2025 Page 1 of 1
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,931 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today