Addendum #1 AHS Building F Replacement Various Modernization Projects

CAMartinez UnifiedschoolConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
--

Description

ADDENDUM NO. 1 Design-Build RFP #26-04 Alhambra High School – Building F Replacement and Various Campus Modernizations Project Martinez Unified School District Martinez, California July 13, 2026 This addendum shall supersede all previously issued specifications, addenda, and drawings wherein this addendum contradicts previously issued documents. All other conditions remain unchanged. The following changes, modifications, corrections, clarifications, and / or additions as set forth herein shall apply to the above documents and shall be made a part thereof and shall be subject to all the requirements thereof as though originally specified and / or shown. QUESTIONS/CLARIFICATIONS – ALL PROJECTS 1.01 N/A. (Section Reserved for DBE Questions received prior to July 8th at 2:00 PM, to be issued in future Addendum.) OUTLINE SPECIFICATIONS 1.02 Section 27 10 00 – Data/Telephone Structured Cabling System: Replace with the attached Section 27 10 00 – Data/Telephone Structured Cabling System – Outline Specifications – Addendum 01. 1.03 Section 27 41 00 – Integrated Audio-Video Systems and Equipment for Instructional Spaces – Outline Specifications: Replace with the attached Section 27 41 00 – Integrated Audio-Video Systems and Equipment for Instructional Spaces – Outline Specifications – Addendum 01. 1.04 Section 28 31 00 – Intrusion Alarm System – Outline Specifications: Replace with the attached Section 28 31 00 – Intrusion Alarm System – Outline Specifications – Addendum 01. PLANS 1.05 Sheet E005 – A/V Diagrams, Details, Data – Details in New “F” Building: Replace with the attached ADD01 E005. All changes are clouded and tagged. 1.06 Sheet E110 – Site Plan – Electrical: Replace with the attached ADD01 E110. All changes are clouded and tagged. 1.07 Sheet E240 – A/V and PA Replacement – Site, Notes, Diagrams: Replace with the attached ADD01 E240. All changes are clouded and tagged. 1.08 Sheet E301 – Electrical One-Line Power Diagram: Replace with the attached ADD01 E301. All changes are clouded and tagged. END OF ADDENDUM NO. 1. RFP # 26-04 – ALHAMBRA HS BUILDING F REPLACEMENT AND VARIOUS CAMPUS MODERNIZATIONS PROJECT ADDENDUM NO. 1 July 13, 2026 Page 1 of 1 ALHAMBRA HIGH SCHOOL – CLASSROOM BUILDING REPLACEMENT AND CAMPUS MODERNIZATIONS MARTINEZ UNIFIED SCHOOL DISTRICT SECTION 27 10 00 – DATA/TELEPHONE STRUCTURED CABLING SYSTEM – OUTLINE SPECIFICATIONS – ADDENDUM 01 PART 1 – GENERAL 1.1 GENERAL A. 1.2 WORK INCLUDED A.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 3,693 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 15, 2026 | ID: 50699680