Project Description: This project will upgrade the West Seattle Stadium to current accessibility standards, including improvement to accessible routes, parking stalls, providing wheelchair seating and a platform lift to the south concrete grandstands, restroom and interior improvements, and other work. This project also includes two additives: Additive No. 1 covers epoxy flooring over sealed concrete in restrooms, and Additive No. 2 includes construction of an additional ramp from the parking area to the concrete bleacher structure.Engineer's Estimate: Base: $2,657,783.00, Additive#1: $20,555.00, Additive#2: $286,692.00. Project Location: West Seattle Stadium- 4432 35th Ave SW, Seattle, WA 98126
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today