The scope of work involves furnishing all labor, materials, services and equipment required to construct the drilled pier foundations, pedestrian and vehicular signs, and all site improvements necessary to install 36 wayfinding signs throughout Downtown Montgomery. All material and construction requirements shall be in accordance with the 2026 Edition of the Alabama Department of Transportation Standard Specifications for Construction unless otherwise approved and accepted by the City Engineer. The bracket of cost is $400,000 to $500,000. The bracket range is shown to provide general financial information and should not be used in preparing a bid.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Alabama. 897 open bids in Alabama — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today