PROJECT DESCRIPTION: This project consists of the following elements of work: repair of five concrete spillways (Gorge, Diablo Left, Diablo Right, Ross Left and Ross Right) involving saw cutting, concrete demolition and replacement, crack and expansion joint repairs, environmental and safety controls.ESTIMATE: The Engineer's Estimate for this project is approximately $2,350,000 (before tax).PROJECT LOCATION: This project is located at Gorge, Diablo and Ross Dams, upper Skagit River Hydroelectric Project in Whatcom County.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today