Project Description: Demolition of existing Seattle Center perimeter bollards. Replace with owner provided Gibraltar security bollards at designated locations to meet specific anti-terrorism criteria. Installation includes new mechanical bollard system with sump pump and HPU. Repair of concrete and ground finishes to match existing.Engineer's Estimate: $650k (not including tax)Project Location: Seattle Center Campus / Exterior Grounds, 305 Harrison St. Seattle, WA 98109
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today