Scriber Creek Trail Phase 2

WALynnwoodcityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
21697
Open Date
May 26, 2022
Close Date
--
Status
Closed

Description

This Contract provides for improvement of Scriber Creek Trail Phase 2, which runs from north of 200th St SW to the southwest corner of Lynnwood Transit Center. The work includes but not limited to construction of approximately 0.4 miles of 10- to 12-foot-wide paved trail with gravel shoulders, 910 feet of elevated boardwalk structure, cement concrete sidewalk, curb ramps, curb and gutter, stormwater conveyance system, concrete driveway crossings, erosion control, site preparation, grading, utility adjustments/relocation, roadway channelization striping, pavement markings, trail amenities, permanent signage, signal system modification at the intersection of 200th St SW/Cedar Valley RD and other electrical appurtenances including service cabinet, signal controller, electrical lines and junction boxes, illumination system, wetland mitigation planting, traffic control, and other miscellaneous work.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 9, 2026 | ID: 45328021

Open Construction Bids in Washington

WACountyOpenTODAY
Urgent Wastewater System Repairs
King County · #KC001697
Construction
WACityOpenAug 18, 2026
2026 CDBG ADA Ramps
Richland · #ITB #26-0055
Construction