Scriber Creek Trail currently is a soft surface pedestrian trail that generally follows the Scriber Creek corridor in Lynnwood. The trail links Scriber Lake Park, Sprague’s Pond Mini Park (approximately 170 feet east of 52nd Place West and 200th Street Southwest), Scriber Creek Park, the Interurban Trail and The Lynnwood Transit Center on 44 Ave W. This project will improve and convert the existing trail to a Multi-modal connection between Lynnwood’s PSRC designated Regional Growth Center & City Center Sub-Area, the Interurban Regional Trail, the Lynnwood Transit Center, and the future Lynnwood Link light rail station (2023) and SWIFT bus-rapid transit routes on 196th St SW (SR 524).The firm selected will assist the City of Lynnwood (City) with oversight of the construction activities performed by the awarded contractor.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today