NWACC RFQ-26-001 General Contractor Questions and Answers Question 1 What's the delivery method for this job? Is it a hard bid? If so, would you be able to send me the prints electronically as we do not have them yet. Answer 1 Please refer to the bid documents on this website. https://www.nwacc.edu/administrativeservices/purchasing/bids.aspx The RFQ hard copy response should be signed and delivered before 10 am on the Bid Opening Date. Construction Manager at Risk selected through this RFQ process. The selected General Contractor will work with the team during pre-construction and continue-on through construction. Construction documents/specifications will only be shared with the selected contractor. Question 2 I am unable to open the EO 98-04 Disclosure Form. Answer 2 https://sas.arkansas.gov/wp-content/uploads/2020/04/contgrantform.pdf Question 3 Also, page 21 of 21, the Combined Certifications for Contracting with the State of Arkansas, asks for a contract number. We will sign this page however we are not aware of a contract number. I do not know what that is referring to. Answer 3 This is a state form. You do not have to have a contract number. Please sign and include in the RFQ response package. Question 4 I am working on an RFQ right now to hopefully turn into you by early next week. Would you be able to let me know when the drawings/specs come out? Answer 4 Please refer to the bid documents on this website. https://www.nwacc.edu/administrativeservices/purchasing/bids.aspx The construction document/specifications process has just begun with receipt of the Young and Associates report. That will be the basis of design. The full design schedule will be shared after the contractor is selected. Construction documents/specifications will only be shared with the selected contractor. Question 5 We assume an AIA A133 contract form will be used for the selected contractor. Please confirm. Answer 5 AIA A102 Construction Manager at Risk selected through this RFQ process. The selected General Contractor will work with the team during pre-construction and continue-on through construction. Construction documents/specifications will only be shared with the selected contractor. Question 6 The RFQ mentions a bid opening. Can you please let us know what information will be disclosed during this opening since the RFQ response does not have a price component? Answer 6 Bid Opening is the deadline to have the RFQ response to NWACC before 10 am.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Arkansas. 534 open bids in Arkansas — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today