This project will involve the design and construction of street/traffic improvements in and around the North Lynnwood Costco area. These improvements are necessary to accommodate existing and future traffic volumes, as well as to enhance overall safety and connectivity. The planning area includes, but is not limited to, 33rd Ave W, Maple Road, Beech Road, SR-525, Alderwood Mall Parkway, 30th Pl W, 182nd St SW, and 184th St SW. Phase 1 will identify a list of transportation projects recommended for short-term implementation (1–2 years) and long-term implementation (3–20+ years). Phase 1 will also develop short-term solutions construction bid package. Future phases will involve preparing plans, specifications, and cost estimates for the improvements identified in the Phase 1 study, consistent with the phasing plan developed by the Consultant. It is anticipated that multiple phases will be required to complete the improvement.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today