StocBqB 14503563 5278565 HODGfU 149942 fgQrPeF ix Sa2h2w5 NxDYDqp 17547901 RlOfH 2150 2043 2755697 083523633 9759 WcTWvbjZv 8 09543 E sHXcPFZkton Metropolitan 36 Ax4x0T 47805 1901667 CUIGEOqt HTLSJdRLSAirport Improvements

CASan Joaquin CountycountyConstructionCloses in 15 days
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
25005-SUB
Open Date
Aug 14, 2026
Close Date
Aug 14, 2026
Status
Open

Description

W.E. O’Neil (WEO) has been selected by County of San Joaquin to the be the General Contractor for the Stockton Metropolitian Airport Improvements Project located in Stockton, CA. More specifically the project will consist of expanding existing terminal to include a new hold room, partially cover outdoor wine garden, improving portions of the existing terminal building, constructing a new naturally ventilated baggage claim building and walkway canopy, additions and revisions to fencing, gates, li

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,941 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 30, 2026 | ID: 62248974

Open Construction Bids in California