BFT currently has thirty-two (32) overhead doors on the Maintenance building, with twenty-two (22) of the doors being motorized, and five (5) motorized overhead doors on the Bus Wash building. There are nine (9) interior overhead doors that are stationary.Historically, BFT has had eighty (80) hours of inspection, repair and/or replace labor time, per year. BFT costs have averaged $5,000-$10,000 annually for preventative maintenance and repair services and parts/materials. BFT has removed preventative maintenance from the solicitation. The scope of work will only include inspection, repair and or replace labor time and materials. BFT does not guarantee a minimum or maximum dollar amount associated with this Contract. The Contractor is responsible for obtaining all project related permits as required.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today