This work consists of clearing and grubbing, installing wildlife perimeter fencing, and installing vehicle and pedestrian manual swing gates. Bid Additive 1 – Schedule B: Additional Obstruction Removal (AIP Eligible) This work consists clearing and grubbing, and removing trees obstructing the Runway Object Free Area and 20:1 approach surfaces, and constructing a new gravel access road.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today