Project Description: This Project is a Covered Project subject to the City of Seattle’s Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayorand City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living ineconomically distressed communities, women, and people of color access to work on the city’s construction projects. It gives contractors access to these skilled workers.This renovation project includes improvements to the athletic playfields, play area, and improves accessible routes of travel to the restroom, field dugouts, play area, and parking lot in compliance with the Americans with Disabilities Act (ADA) standards. The project details include new equipment for the play area; new drainage, irrigation, grass playing surface, and backstops for the playfields; ADA access toparking, public restroom, and play area. This project also includes a complete renovation of the existing public restroom. Work includes but is not limited to the following: Temporary Erosion and SedimentationControl (TESC), Contaminated Soil Removal, Site Demolition, Shoring, Earthwork, Storm Drainage Utilities, Electrical & Lighting, Concrete and Asphalt Pavement, Play Equipment, Play Area Surfacing,Planting, Irrigation, Site Furnishings, Plumbing, Framing, Roofing. Add #1 Site Improvements South of Main Entry, Add#2 Embankment Slide Alt#1 PIP Surface in lieu of EWF Alt#2 CIP Concrete in lieu ofAsphalt at Main PlazaEngineer's Estimate: $ 5,692,000.00 Add#1: $481,989.00 Add#2: $111,003.00 Alt#1: $112,737.00 Alt#2: $44,564.00Project Location: 4801 Corson Ave S, Seattle, WA 98108
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today