Project Description: This project involves the replacement of play equipment and selective replacement of paving to ensure an accessible route to the play area. Additionally, there are three additives to the project: trash and recycling bins, a free-standing accessible drinking fountain, and air spading and soil amendments at the cherry tree grove. Engineer's Estimate: Base Cost: $181,275.00, Add#1: $2,838.00, Add#2: $4,375.00, Add#3: $2,500.00Project Location: 917 34th Avenue Seattle, WA 98122
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today