Lakeridge Slope Stabilization

WASeattlecityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
183556
Open Date
Jul 11, 2025
Close Date
--
Status
Closed

Description

Project Description:  This Project consists of the following elements of Work: Stabilize approximately 210 feet of sloped areas along the Taylor Creek trail by constructing micropiles and a concrete grade beam, make temporary and permanent improvements to the boardwalk and small bridges along the trail needed for construction equipment access, soil restoration in disturbed areas (vegetation restoration to be done by others), construct a temporary sewer bypass, and construct a 10-foot extension of two existing stormwater culverts.Engineer's Estimate: $1,800,000 (without sales tax)Project Location:  This Project is located in southeast Seattle in Lakeridge Park starting at the Taylor Creek trail entrance at 68th Ave S & Holyoke Way S (north end of project site) and continuing south approximately 2,000 feet along the trail

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4170928

Open Construction Bids in Washington

WACountyOpenTODAY
Urgent Wastewater System Repairs
King County · #KC001697
Construction
WACityOpenAug 18, 2026
2026 CDBG ADA Ramps
Richland · #ITB #26-0055
Construction