The work consists of Schedule A: constructing approximately 4,300 linear feet of ductile iron water mains and installing new fire hydrants, water services, blowoff assemblies, valve replacement, and other work as required to complete the project. The work also consists of Schedule B: restoring surface conditions, including asphalt trench patch, asphalt overlay, road repair, curb ramps, general restoration, and other work required to complete the project.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today