The Lift Station 10 (LS 10) Wet Well Cleaning and Force Main Improvements project consists of cleaning a sewer wet well while providing a redundant temporary sewer bypass system, cutting and removing the end of the LS 16 force main discharge inside the force main discharge manhole, and mechanical improvements to four air vacuum and air release assemblies (AVARVAs) on the force main.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today