ITB - Connecting Lynnwood: Poplar Way Bridge

WALynnwoodcityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
210359
Open Date
Oct 23, 2025
Close Date
--
Status
Closed

Description

Construction of a new multimodal six-lane bridge over I-5 between the intersections of 196th Street SW (State Route 524) & Poplar Way and 33rd Avenue W & Alderwood Mall Boulevard. The bridge will provide multimodal travel with a sidewalk (west side) and shared use path (east side). The two intersections will be modified to meet the profile and width of the new bridge, and a tunnel (three-sided concrete box structure) will be constructed to allow the Interurban Trail to pass beneath the new bridge. Widening and restriping of portions of Poplar Way, 196th Street SW, Alderwood Mall Boulevard, 33rd Avenue W, and Alderwood Mall Parkway are also included. Federal Aid Number: STPUL-IMD-REP-RAISE-STBG-HLP-2004(037) Please see Full Project Manual for all project details.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 9, 2026 | ID: 45327968

Open Construction Bids in Washington

WACountyOpenTODAY
Urgent Wastewater System Repairs
King County · #KC001697
Construction
WACityOpenAug 18, 2026
2026 CDBG ADA Ramps
Richland · #ITB #26-0055
Construction