Mount Vernon Fire seeks a professional design consultant to assist with Phase I of the project, for replacement of fire station 1 which is to, identify current and future space and operational needs, prepare conceptual design options, forecast construction and total project costs (project costs will be used to determine the bond amount needed for a potential 2025 ballot measure). Phase II of the project will consist of the further development of design and construction documents, permitting and bid assistance, and construction contract administration services. Upon completion of Phase I of the project. The City reserves the right to enter into contract with the same firm for Phase II services, or to solicit for Phase II.<span data-ccp-props="{"134245417":false,"201341983":0,"335551550":6,"335551620":6,"335559740":278,"
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today