EV Bus Chargers

WABEN FRANKLIN TRANSITtransitConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
154650
Open Date
Mar 14, 2025
Close Date
--
Status
Closed

Description

BFT is requesting bids for the installation of two EV Charging Units at our 1000 Columbia Park Trail, Richland, WA location. The project consists of providing site work and electrical distribution for the install of two (2) ChargePoint Express Plus 200kW Chargers with two (2) ChargePoint Express Dispensers, adjacent to the existing bus wash building. Additional utility service upgrade to a 750kva transformer will be required. The ChargePoint Express units will be furnished by BFT.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 9, 2026 | ID: 45329285

Open Construction Bids in Washington

WACountyOpenTODAY
Urgent Wastewater System Repairs
King County · #KC001697
Construction
WACityOpenAug 18, 2026
2026 CDBG ADA Ramps
Richland · #ITB #26-0055
Construction