Project Description: This Project consists of the following elements of Work: demolition and site preparation, construction of vacuum truck pad and bioretention facility, 12” diameter storm drainage pipe, maintenance holes, a pre-settling pipe facility, street restoration, landscaping, and pedestrian path lightingEngineer's Estimate: $1,300,000.Project Location: This Project is located along the Chief Sealth Trail from the intersection of S Kenyon St and Kenyon Way S on the west to the intersection of S Kenyon St and 39th Ave S on the east
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today