ADDENDUM 1 to Bidding Documents for Partial Removal of Castleton State College Dam (aka Glen Brook Dam) Vermont State University – Castleton Castleton, VT May 4, 2026 This Addendum modifies, amends and supplements the Bid Documents dated April 20, 2026 for the abovereferenced contract. 1. Summary of Pre-Bid Meeting: a. Scope – as described by the Bid Documents, the Project generally includes removal of the top 2 to 3 ft. of the existing concrete, excavation of sediment and placement in upland, filling of low level outlet, treatment of knotweed, and seeding/restoration of grass. b. Water control – the Bid Documents require the Contractor to control water to perform the work in-the-dry. The method(s) of water control, whether pumping, siphoning, diversion, cofferdams, use of low-level outlet (if operable), or other, are at the Contractor’s discretion within the constraints described on the Drawings (e.g. Sheet 2, notes 32 through 43, etc.). c. Schedule – As described by the Bid Documents, construction start is expected on or about July 6, 2026, substantial completion is required by August 7 with project completion by August 21, 2026. d. The following permits have been obtained or are pending approval and are applicable to the Contractor’s work on the Project: i. VT Dam Safety ii. VT Act 250 iii. VT Flood Hazard and River Corridor Rule iv. USACE Project Notification Form (pending) v. VT Section 402/NPDES (pending) e. As described by the Bid Documents, the Project is funded in part by a FEMA grant and, as such, is subject to Buy America, Davis Bacon Act, and other federal laws and rules. 2. Pre-bid meeting attendees and plan holders: a. Sam Markowski, Markowski Excavating, sam@markowskiex.com b. Brad Kendall, Favian Earth Moving, bradkendall@fabianearthmoving.com c. Daniel Brill, Davenport Excavation, RDdavenp@gmail.com 3. Questions received during or after pre-bid meeting and responses: a. Q: The Drawings specify concrete removal – what finish is required, sawcut (smooth) or hammered? A: Drawing Sheet 5, Note 1.2 specifies sawcut. Owner will accept hammered/broken surface, however, if the finished surface at all points is within ±0.1 ft. of the design surface elevation p. 1 of 4 Addendum 1 to Bid Documents Partial Removal of Castleton State College Dam, VSU-Castleton SA File No. 141-20-0013 May 4, 2025 Page 2 of 4 and dimension, remaining concrete to is intact and undamaged, and appearance is acceptable to Owner. b.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Vermont. 328 open bids in Vermont — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today