Berkshire Wind Project Credit Rating Affirmed at A+

MABERKSHIRE WIND POWER COOPERATIVE CORPORATIONutilityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Contact: David Tuohey, MMWEC Director of Communications & External Affairs (413) 308-1392 dtuohey@mmwec.org Berkshire Wind Project Credit Rating Affirmed at A+ LUDLOW, Mass. – November 22, 2016 – The A+ credit rating of the Berkshire Wind Power Project, the state’s second largest wind farm, has been affirmed by Fitch Ratings, which cited the financial strength and stability of the municipal utilities that own the project along with the Massachusetts Municipal Wholesale Electric Company (MMWEC). The ratings outlook from Fitch is stable. “Strong project participants evidencing considerable financial wherewithal benefit the BWPCC (Berkshire Wind Power Cooperative Corporation) project rating,” according to Fitch. “In addition, the participants’ healthy financial positions should ultimately help ensure that BWPCC meets all financial commitments.” Project owner BWPCC is comprised of 14 Massachusetts municipal utilities and MMWEC, all non-profit, public power entities. Through contracts with BWPCC and MMWEC, the municipal utilities receive their shares of project output and are responsible for their proportionate share of project costs. BWPCC issued $64.7 million in bonds to finance the project, a 10-turbine, 15-megawatt wind farm on Brodie Mountain in Hancock, Mass., that started operation in May 2011. “The Berkshire Wind Power Project embodies the commitment of Massachusetts municipal utilities to a clean energy future,” said MMWEC Chief Executive Office Ronald C. DeCurzio. “The project’s A+ credit rating reflects the strong financial standing of municipal utilities but also the value of municipal utility joint action through MMWEC,” he said. The rating also is a reflection of the project’s ability to meet its performance goals, according to Ed Kaczenski, Director of Engineering and Generation Assets for MMWEC. “The project capacity factor is right in line with initial forecasts, averaging 38.3 percent since 2014,” Kaczenski said. “The Berkshire Wind Power Project’s performance is exceptional for an inland wind resource.” The capacity factor represents the percentage of time the project produces electricity when it is available for operation. Due to varying wind availability, most inland wind projects operate at a capacity factor nearer 30 percent, but Brodie Mountain is one of the windiest sites in Massachusetts. The project produces enough electricity to power approximately 6,000 homes.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Massachusetts. 3,263 open bids in Massachusetts — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 28, 2026 | ID: 909174

Open Other Bids in Massachusetts

MAStateOpenSep 8, 2026
Town Treasurer Services
BidNet Direct - Massachusetts
Other
MAStateOpenSep 8, 2026
Snow Removal Services for BRA Properties 2026
BidNet Direct - Massachusetts
Other
MACityOpenSep 8, 2026
Leak Detection Services
Yarmouth · #RFP-27-WW-009
Other