A+ Berkshire Wind Project Gains Improved Credit Outlook from Fitch, Affirmed Rating from S&P

MABERKSHIRE WIND POWER COOPERATIVE CORPORATIONutilityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

NEWS RELEASE MASSACHUSETTS MUNICIPAL WHOLESALE ELECTRIC COMPANY Contact: David Tuohey, Director of Communications & External Affairs (413) 308-1392 dtuohey@mmwec.org A+ Berkshire Wind Project Gains Improved Credit Outlook from Fitch, Affirmed Rating From S&P Ludlow, Mass. – December 12, 2017 -- Fitch Ratings has issued an improved outlook on the credit rating for the Berkshire Wind Power Cooperative Corporation (BWPCC), assigning a positive outlook and ‘A+’ rating to the project’s current debt and advance refunding bonds planned for issuance later this month. S&P Global Ratings has assigned its ‘A’ long-term rating to BWPCC’s advance refunding bonds, while affirming its ‘A’ rating on BWPCC’s wind project revenue bonds outstanding. The S&P outlook is stable. Fitch Ratings cites the take-or-pay power purchase agreements between project co-owner, the Massachusetts Municipal Wholesale Electric Company (MMWEC), and 14 of its 20 member municipal light departments, and the strong credit quality of the participating members, in its outlook revision. “The Positive Outlook reflects the participants’ continued economic and financial strength and stability, a favorable trend that Fitch expects will continue,” Fitch stated. In addition to these factors, S&P cited the important role the project will play in the future as Massachusetts seeks to reduce the carbon output of its energy resources. “Its environmental profile makes it attractive in an increasingly carbon-constrained environment,” S&P stated. The BWPCC is currently in the process of advance refunding of its outstanding debt to produce debt service savings, with a closing expected on December 14, 2017. BWPCC initially issued bonds in 2010 to finance the construction of the 10-turbine, 15-megawatt Berkshire Wind Power Project, located in Hancock, Mass. Of the initial $64.7 million in tax-exempt revenue bonds issued to finance the project, approximately $44.4 million in bonds currently are outstanding. All of the BWPCC project participants also are MMWEC project participants, and the underlying credit metrics for both entities are similar. ### Massachusetts Municipal Wholesale Electric Company, 327 Moody St., Ludlow, MA 01056

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Massachusetts. 3,260 open bids in Massachusetts — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 28, 2026 | ID: 909138

Open Other Bids in Massachusetts

MACityOpenSep 8, 2026
Leak Detection Services
Yarmouth · #RFP-27-WW-009
Other
MAStateOpenSep 8, 2026
Town Treasurer Services
BidNet Direct - Massachusetts
Other
MAStateOpenSep 8, 2026
Snow Removal Services for BRA Properties 2026
BidNet Direct - Massachusetts
Other