Project Description: The purpose of the Work at the Broadview Site is to provide water quality treatment for street runoff by installing bioretention systems. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning of existing drainage structures and piping; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities, including water services; reconnection to the existing drainage system; installation of new drainage systems, including storm drainage piping, drainage structures, bioretention cells, and flow splitters; flow testing; install gate valves and assist SPU crews with water service and meter box relocations/adjustment; television inspections; side sewer reconnections; and final site restoration, including surface paving, pavement markings, permanent signing and posts, sidewalks, curbs, driveways, curb ramps, planting, and landscape establishment. The purpose of the Work at the Sylvan Site is to provide water quality treatment for street runoff that drains to Longfellow Creek by retrofitting the roadside with bioretention treatment system. This portion of the Project consists of the following elements of Work i
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today