200 Road Bridge At Chester Morse Lake

WASeattlecityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
176600
Open Date
Jun 11, 2025
Close Date
--
Status
Closed

Description

PROJECT LOCATION:  This Project is in the Cedar River Municipal Watershed along the 200 Road at Chester Morse Lake (LAT/ LONG: N47.40849193, W121,7219438) behind secured gates. PROJECT DESCRIPTION:  This Project consists of the following elements of Work: strengthening structural concrete elements of the 200 Road Bridge with a carbon fiber reinforced polymer composite system, painting bridge piles and repaving the bridge approach slab transitions.   ESTIMATE:  The Engineer's Estimate for this Project is $362,000.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4170949

Open Construction Bids in Washington

WACountyOpenTODAY
Urgent Wastewater System Repairs
King County · #KC001697
Construction
WACityOpenAug 18, 2026
2026 CDBG ADA Ramps
Richland · #ITB #26-0055
Construction