PROJECT LOCATION: This Project is in the Cedar River Municipal Watershed along the 200 Road at Chester Morse Lake (LAT/ LONG: N47.40849193, W121,7219438) behind secured gates. PROJECT DESCRIPTION: This Project consists of the following elements of Work: strengthening structural concrete elements of the 200 Road Bridge with a carbon fiber reinforced polymer composite system, painting bridge piles and repaving the bridge approach slab transitions. ESTIMATE: The Engineer's Estimate for this Project is $362,000.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today