Work of the project includes building a 10-foot-wide asphalt path approximately 2.36 miles long. Base Bid does not include the 69th St neighborhood connection 115+27 to 127+23 and 70th St neighborhood connection 500+57 to 507+88, which is future work by others. Total 10-foot-wide asphalt path length with future work by other is approximately 2.53 miles long.Content TypeBidBusiness TypeConstructionDepartmentAdministrative Services
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Wisconsin. 979 open bids in Wisconsin — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today