The Project generally consists of one (1) schedule encompassing one (1) project site. The site is described further below: Wall Avenue from 6th Street to 7th Street consists of storm sewer pipes and inlets along with pavement improvements for the long-term goal of replacing the existing Old Willow Branch storm system. This project is the downstream, one block section of the proposed Willow Branch stormwater project. This project must be completed before the construction and completion of the MoDOT 7th Street’s storm sewer at Wall and 7th Street. Project site quantities include: 441 LF of 12’x4’ reinforced concrete box storm sewer, 53 LF of 18” reinforced concrete pipe, 4 Type ‘C’ curb inlets, 1 3’x3’ I.D. junction box, 869 tons of crushed stone base, 1,973 SY each of 8” asphaltic concrete base and 2” asphaltic concrete surface, 865 LF of curb and gutter, 5,219 SF of concrete sidewalk, 401 SF of concrete ADA sidewalk ramp, 236 SY of driveway construction, 1,681 SF of brick pavers, 531 CF of Silva Cell, and other miscellaneous work required for completion of the project.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Missouri. 731 open bids in Missouri — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today