This project is for improvements to the electrical system at the William E. Dunn Water Reclamation Facility. The project includes the removal of the existing transformers at the East Motor Control Center (MCC), West MCC, and Maintenance building; removal and replacement of the existing East and West MCCs; removal of the existing east and west generator sets; installation of two new transformers; installation of two new generators, new electrical building and installation of new conduit and wiring as required.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today