Whitney Avenue Improvements Phase 1

CTNew HavencityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
161834
Open Date
Apr 10, 2025
Close Date
--
Status
Closed

Description

Roadway construction and traffic signal installation along Whitney Avenue from Canner Street to Cliff Street. The project will install a new asphalt bike path along the east side of the road and revise traffic patterns and intersection designs to increase safety for all roadway users. Typical work includes demolition, curb installation, concrete sidewalk, concrete sidewalk ramps and driveways, raised asphalt crosswalks and intersections, storm drainage, milling and paving, pavement markings, traffic signs, and traffic signal equipment. One traffic signal is proposed to be fully removed and replaced and one will be modified and upgraded.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Connecticut. 1,444 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4158599

Open Construction Bids in Connecticut

CTStateOpenAug 14, 2026
Meadow Street Park Renovation
State of Connecticut (CTsource) · #4527
Construction
CTStateOpenAug 14, 2026
Environmental Engineering Services On Call
State of Connecticut (CTsource) · #PLV RFQ 2027-04E
Construction
CTStateOpenAug 14, 2026
Meadow Street Park Renovation
BidNet Direct - Connecticut
Construction
CTStateOpenAug 14, 2026
Concrete Stair Replacement Lebanon Elementary
State of Connecticut (CTsource) · #38027
Construction