The driveway and parking area was flooded by Hurricane Ian in September/October 2022. This caused damage to the asphalt. This project will include milling, removing part of the road base so that the new asphalt will meet the specifications of 1 1/4 inches thick and to also be equal to the existing curbing and stormwater structures.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today