WHCCD Lemoore Campus Paving Repair

CAWest Hills College-Coalingacommunity collegeRoads & PavingCloses in 22 days
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
Sep 3, 2026
Status
Open

Description

FIRE EXTINGUISHER F.E.C. FIRE EXTINGUSHER OFOI O.F.R.D. O.H. OPPOSITE HAND F.FLR. FINISH FLOOR O.H.C.D. OVER HEAD COILING F.G. FINISH GRADE F.H. FIRE HYDRANT FHMS FLAT HEAD ACST. A.C.T. ACOUSTIC CEILING TILE FHWS MACHINE SCREW O.H.W.S. OPP. OPPOSITE FIN. ADA AMERICANS WITH FIXT. FIXTURE O/ OVER DISABILITIES ACT FLR. FLOOR(ING) ORIG. ORIGINAL ADA ACCESSIBLE FLASH. FLASHING OVHD OVER HEAD GUIDELINES FLUOR. FLUORESCENT OWJ OPEN WEB JOIST ADDL. ADDITIONAL F.O. FACE OF ADJ. ADJUSTABLE F.O.C. FACE OF CONCRETE P.B.N. PLYWOOD BOUNDARY ADJC. ADJACENT F.O.F. FACE OF FINISH A.F.F. ABOVE FINISH FLOOR F.O.M. FACE OF MASONRY A.F.G. ABOVE FINISH GRADE F.O.S. FACE OF STUD AGG. AGGREGATE FRP FIBERGLASS REIN- ALT. ALTERNATE NAILING P.E.N. PLYWOOD EDGE P.E.S. NAILING PLYWOOD EDGE FORCED PANELING F.S. FIRE SPRINKLER(S) F.S.H. FIRE SPRINKLER HEAD A.P.C. ACOUSTIC PANEL CEILING FT. FOOT/FEET A 000A POST INDICATOR P.LAM. VALVE PLASTIC LAMINATE P.L. PROPERTY LINE APPROX. APPROXIMATE FURR. FURRING PL. PLATE ARCH. ARCHITECT(URAL) FUT. FUTURE PLAS. PLASTER AV AUDIO VISUAL GA. GAUGE BD. BOARD PLYWD. PR. PSF PLYWOOD PAIR POUNDS PER GALV. GALVANIZED BEL. BELOW G.B. GRAB BAR B.E.N BOUNDARY EDGE NAILING G.C. GENERAL CONTR. GEN. GENERAL BLDG. BUILDING G.I. POUNDS PER GALVANIZED IRON PT. P.T.D. SQUARE INCH POINT PAPER TOWEL DISP. P.T.D.F. PRESSURE TREATED BLK. BLOCK GL. GLASS BLKG. BLOCKING GND. GROUND BM. BEAM GR. GRADE PTN. PARTITION BOT. BRG. BOTTOM BEARING GYP. GYPSUM PVC POLYVINYL CHLORIDE BTWN. BETWEEN R. RADIUS B.U.R. BUILT-UP ROOF(ING) R THERMAL A CLASS 3 INSPECTOR REQUIRED FOR THIS PROJECT SHALL BE EMPLOYED BY OWNER AND APPROVED BY ARCHITECT, STRUCTURAL ENGINEER, AND DSA. INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4-333(c). THE DUTY OF THE INSPECTOR SHALL BE IN ACCORDANCE WITH TITLE 24 SECTION 4-342, PART I. 7. SUPERVISION OF CONSTRUCTION BY DSA SHALL BE IN ACCORDANCE WITH TITLE 24 SECTION 4-334, PART 1. 8. CONTRACTOR, INSPECTOR, ARCHITECT, AND ENGINEERS SHALL SUBMIT VERIFIED REPORTS (FORM SSS-6) IN ACCORDANCE WITH TITLE 24 SECTION 4-336, PART I. DOOR REFERENCE 9. A WINDOW SYMBOL WINDOW REFERENCE SQUARE FOOT PSI 6. 00.00 41 HOSE BIBB HBD. HARDBOARD KEYNOTE SYMBOL KEYNOTE REFERENCE, REFER TO KEYNOTE LIST ON SHEET DOUGLAS FIR H.C. HOLLOW CORE RETURN AIR ROOF DRAIN HD. HEAD REFL. REFLECTED H.D.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in California. 5,095 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Aug 10, 2026 | ID: 69583972

Open Roads & Paving Bids in California

CACityOpenTODAY
South Glendale Pavement Management Plan (PMP) Implementation Project
Glendale · #3964
Roads & Paving
CACityOpenAug 13, 2026
27 Local (HSIP) City-wide Traffic Signal Communications System Upgrades
Escondido · #26- 27
Roads & Paving
CAStateOpenAug 13, 2026
Design Services for Annual Pavement Resurfacing and Overlay Projects
BidNet Direct - California
Roads & Paving