The Western Placer Waste Management Authority (WPWMA) is soliciting competitive bids for furnishing all labor, material, tax, transportation, equipment, and services necessary for the MODULE 6 LINER project. WPWMA has estimated cost of the Work to be $10,000,000. The Work generally consists of final grading of an already excavated landfill module area to remove approximately 32,000 cubic yards (CY) of soil, exposing existing adjacent liner, construction of approximately 20 acres of dual composit
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 5,095 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today