There is an Air Handling Unit (AHU) (Asset ID 63801) that provides makeup air to the Locker Rooms and Restrooms in Westerly Solids Handling. This AHU, originally installed in 1998, is no longer functional and is beyond its useful life. The Westerly (W20) Third Floor Tempstar HVAC Unit Project will include the removal of the existing ceiling-hung Tempstar indoor fan coil unit, associated exterior condensing unit, and accessories. The project will also include installation of a new energy recovery AHU, new Direct Expansion (DX) fan coil unit, new condensing unit, new dehumidifier, new refrigerant piping, and electrical work and operational testing.The duration of the requirement contract with the Northeast Ohio Regional Sewer District (NEORSD) shall be until the completion of work under the contract or until the funds appropriated to this contract are exhausted, whichever should occur first from the effective date of this Contract. There will be an optional but strongly recommended Site Visit and Pre-bid meeting scheduled for September 11, 2025 at 10AM. Details will be provided in the project documents located on NEORSD's OpenGov electronic bidding platform.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Ohio. 1,187 open bids in Ohio — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today