The West Cliff 60-inch RCP Repair Project will stabilize the eroded slope around the 60-inch reinforced concrete pipe beneath the West Cliff Dr footpath between Auburn Ave and Sacramento Ave. The goal of this project is to prevent property loss to a public infrastructure, stabilize the eroded slope, and restore the 60-inch outfall by December 2024.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today