BID TABULATION FA-26 Campus FA Project Woodside Elementary School District BID TIME : 05/07/2026 2:00 PM Bids due in : $ (46,147.69) All bid results are pending staff review before award is made by the Board. 5/5/26 - 4:33 PM BID PACKAGE A CONTRACTOR (follow LINKS below to review bid) 1 ARC Key solutions- Sprig Electric 2 Atlas Pellizari Electric 3 General Lighting Service Inc. CSLB License Classification C-10 C-10 C-10 CSLB Lic. #2967828 #375862 #466869 Number of Designated Subcontractors All Addenda Noted 1 1 1 N/A Yes Yes ALLOWANCE AMOUNT BID STATUS TOTAL BASE BID DEDUCT ALTERNATE #1 (C) NON RESPONSIVE IN REVIEW IN REVIEW $ $ 50,000.00 50,000.00 $ $ 942,000.00 2,090,000.00 $ $ (7,000.00) (21,000.00)
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in California. 5,013 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today