The work consists of the modification of existing plumbing at six (6) residences at the Willimantic Camp Meeting Association (WCMA) community to allow for the installation of 5/8 inch water meters. WWW shall shut off water service to the properties and provide the water meter and couplings necessary for its installation by the Contractor. The selected Contractor shall be responsible for providing all other labor and materials, including coordination and scheduling with WCMA, the tenants, and WWW
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Connecticut. 1,532 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today