Wastewater Treatment Plant Phase 2 Expansion Construction Manager and Inspector

TXKylecityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
210518
Open Date
Oct 24, 2025
Close Date
--
Status
Closed

Description

The City of Kyle has authorized a construction contract to expand its municipally owned wastewater treatment plant. The project will increase the facility’s current capacity from 4.5 million gallons per day (MGD) to an interim capacity of 6 MGD (Early Works Package), ultimately reaching a final capacity of 9 MGD (Final Works Package). To ensure the successful execution of this expansion, the city requires the services of a highly qualified and experienced construction manager and inspector. Acting as representatives of the City, these professionals will be responsible for verifying that all work is completed in strict accordance with the approved project plans, specifications, and the City of Kyle’s standards and design requirements.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Texas. 3,624 open bids in Texas — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 8, 2026 | ID: 44613360

Open Construction Bids in Texas

TXstate_agencyOpenTODAY
Clements Unit - Construction Manager at Risk for BOQ
Texas Department of Criminal Justice · #RFSQ-US.227527
Construction