Walnut Lift station Force Main was partially completed in 2013 from the Walnut Lane Lift station south bound until Bode Road. The remaining 1000 feet of the force main construction was not in the design and was left to be completed at a later date. The remainder of the force main should be designed for bid and construction documents. The Village of Schaumburg, IL will accept proposals via the Village's e-Procurement Portal, OpenGov https://procurement.opengov.com/portal/villageofschaumburg for 'Project ID, <path fill-rule="evenodd" clip-rule="evenodd" d="M6 12C5.44772 12 5 12.4477 5 13V15H3C2.44772 15 2 15.4477 2 16C2 16.5523 2.44772 17 3 17H5V19C5 19.5523 5.4477
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Illinois. 2,211 open bids in Illinois — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today