The Work to be performed under the Contract consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to convert the existing High Occupancy Vehicle (HOV) lanes to Express Lanes (previously known as High Occupancy Toll (HOT) lanes) along US 101 from near Metcalf Road to the US 101/SR 85 Separation, and along SR 85 from the US 101/SR 85 Separation to Almaden Expressway Undercrossing in San Jose. The project limits are approximately 2 miles within a portion of US 101 and 6 miles within a portion of SR 85., as further described in the scope in the Technical Specifications.
Unlock the source link for this bid, plus email alerts when similar Vehicles & Equipment bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today