The Project consists of replacing the existing bridge with an 85’ long steel stringer bridge with concrete deck superstructure supported on semi-integral abutments. Traffic will be maintained during construction on a temporary bridge constructed immediately upstream of the existing bridge. Roadway approach reconstruction limits are approximately 975 ft.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in New Hampshire. 472 open bids in New Hampshire — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today