Design-Builder Firm Name: Clark ConstructionProject Overview:The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed.Trade Package No.: TP-0035Trade Package Title: SFO Cargo 626 Material Handling System InstallationDescription of the Trade Package Scope of Work: Scope of work includes mechanical installation of the Material Handling System. Trade Package Bid Due Date and Time: 09/18/2026 2pmCMD LBE Participation Requirement %: 5%Main Trades of the Trade Package: Material Handling System InstallationBest contact for Trade Package information (Name and Email): Nicolette Madonna, nicolette.madonna@clarkconstruction.com
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,946 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today