General work description: Whole Roof Replacement for Street Division Sign Shop Building.-Install perimeter nailer boards to meet the height of and for the perimeter attachment of the new roof.-Install new flute filler insulation between all ribs of the existing meal roof.-Install a 1/2" coverboard with fasteners over the flute filler layer.-Install new with 60 mil TPO membrane over insulation, mechanically fastened, and all seams heat welded per manufacturer specifications.-The perimeter of roof system will be secured with a termination bar into existing gutters and over fascia-Install new TPO vent flashings and heat weld to TPO membrane-Provide warranty on materials and workmanship-Final clean up of job site and removal and disposal of all debris- Any necessary HVAC, Electrical, or Plumbing work that results as a part of the overall Roof Replacement.-Building permits will be at no cost*Change orders will need to be requested beyond the initial scope.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Missouri. 649 open bids in Missouri — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today