This project involves the renovation of sand bunkers on all eighteen holes. There will be a total of fifty-one (51) sand bunkers rebuilt or new. Thirty (30) of the 51 are greenside sand bunkers. Ten sand bunkers will be eliminated and one sand bunker will be made into two as well as two sand bunkers on one hole will be made into one. Most sand bunkers are being restored at their present locations. Some sand bunkers are being shifted and/or enlarged and will require the Hunter I-20 heads to be re-used and adjusted. Some sand bunkers will need fill hauled and placed as they are being made smaller in size. Additional drainage is indicated on certain holes (example #8 & #11). There is an add/alternate for additional drainage and fairway sod at the discretion of Timberlin GC and will be authorized only in writing if deemed necessary.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Connecticut. 1,444 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today