Third Street NW Complete Street Project - LAP

FLWinter HavencityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
232726
Open Date
Jan 29, 2026
Close Date
--
Status
Closed

Description

The City of Winter Haven is seeking firms interested and qualified to construct a Complete Street Project (LAP) on our behalf.Scope of Work: The project corridor extends along 3rd Street NW from Avenue D to South Lake Silver Drive.  The planned complete street improvements encompass modifications to both horizontal and vertical roadway geometry, incorporation of a variable-width median, reconfiguration of on-street parking, construction of drainage swales, and installation of 8-foot sidewalks on both sides of the roadway.  The design includes a conventional roundabout at the Avenue E NW and a peanut-shaped roundabout at the Avenue F NW intersection.  The scope of work also includes upgrades to sidewalks, pedestrian crossings, lighting, signage, pavement markings, and on street parking. 

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 8, 2026 | ID: 44613864

Open Construction Bids in Florida

FLCountyOpenTODAY
Ellis Building Gutter Replacement
Monroe County · #RFS-644
Construction
FLCountyOpenAug 14, 2026
Construction Manager At Risk (CMAR) Services for the South County Drinking Water Facility Project
Hillsborough County · #CMAR-26-00264
Construction
FLCountyOpenAug 14, 2026
Columns Repair and Structural Improvements at Northeast Transfer Station Truck Wash Building
Miami-Dade County · #RPQ No 18657-26
Construction
FLCityOpenAug 14, 2026
Professional Surface Repairs And Exterior Painting Of Islamorada Fire Station 20
Islamorada, Village of Islands · #RFP-RFP 26-09-0-2026/SMP
Construction