Description The "Owner" is Chitina Electric, Inc and the "Engineer" is HDR Engineering, Inc. Construction of the hydropower facility and all electrical work will be a part of a future contract.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Alaska. 579 open bids in Alaska — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today