Terminal 3 West Modernization - TP 246 - East: Sitework and Site Utilities

CASan Francisco Airport (Construction)airportConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
282517
Open Date
Jul 9, 2026
Close Date
--
Status
Open

Description

Design-Builder Firm Name: Turner Construction CompanyProject Overview:Terminal 3 West ModernizationThe goal of this project is to expand Terminal 3 by approximately 735,000 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.Courtyard 4 Connector (C4C)The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminalprojects.The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for o&ices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,939 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 14, 2026 | ID: 50029434

Open Construction Bids in California

CAStateOpenTODAY
Medical Examiner's Office Storage Building Addition
BidNet Direct - California
Construction
CAStateOpenTODAY
Fire Life Safety System; Building #509
BidNet Direct - California
Construction
CACityOpenTODAY
134 - Dry Creek Greenway East Phase 1 Fence and Landscaping Project
Roseville · #RFP #15-134
Construction
CACityOpenTODAY
Qq - Fy27 Sidewalk Trip Hazard Shaving Project
Woodland
Construction