Segments of the airport taxiway and runway system, taxiway A1 and taxiway D, are deteriorating. The purpose of this project is to rehabilitate and reconstruct these portions of the airport to bring the runway system to optimal functionality.The ultimate development will consist of the rehabilitation of approximately 42,640 sf of Taxiway D and the reconstruction of 20,600 sf of Taxiway A1.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today