SW Phase II RFP No pdf

CTSouth Windsor School DistrictschoolOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
pdf
Open Date
--
Close Date
--
Status
Open

Description

Eli Terry and Philip R. Smith Elementary Schools South Windsor Public Schools Request for Qualifications and Proposals for Storm Water General Permit Inspections and Monitoring RFP No. 1819-024 Issue Date: January 10, 2019 Proposals are Due no later than 2:00 PM on January 31, 2019 CONTENTS I. Project Description II. Scope of Work III. Qualifications of Firms or Individuals Submitting Proposals IV. Submission of Qualification Statements And Fee Proposal V. Method of Selection/Criteria for Award VI. Deadline for Proposals VII. Termination or Amendment VIII. Question and Amendments IX. Insurance Requirements X. Standard Contract Terms XI. Fee Proposal Form Appendix A – Project Schedules Appendix B – Sedimentation and Erosion Control Plans 1 I. PROJECT DESCRIPTION Summary The Town of South Windsor, acting through its Public Building Commission (“PBC”), welcomes qualified firms to submit proposals for storm water monitoring associated with the Connecticut DEEP General Permit Requirements for the new Eli Terry and Philip R. Smith Elementary School projects. These projects are Phase 2 of a three-phase elementary school master plan adopted by the South Windsor Board of Education. The Eli Terry Elementary School will be a new single story, 63,750 square feet structure placed on approximately 17 acres. The project will be constructed on the east side of the site where existing play fields existing while the existing school remains in operation. The project is scheduled to start in April, 2019 with completion anticipated in late fall of 2020. Please refer to Appendix A for the project schedule The Philip R. Smith Elementary School will be a partial single-story and partial two-story, 55,660 square foot structure placed on approximately 15 acres. The west side (rear side of proposed building) contains a pond. The proposed building will be constructed to the east of the pond at the top of the site with the existing and proposed topography sloping downwards to the east to Avery Street. The existing building will be demolished in an early demolition and abatement package starting on January 15, 2019. The full project construction will commence in April, 2019 with an anticipated completion in summer 2020. The architect is Moser Pilon Nelson Architects and the civil engineer is LRC Group. The construction manager is Gilbane Building Company. The owner’s project manager is Colliers International – Project Management Northeast. II.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,524 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42127249

Open Other Bids in Connecticut

CTStateOpenTODAY
Crane Lease/ Rental Services
BidNet Direct - Connecticut
Other
CTStateOpenTODAY
Public Address System at Bunker Hill & Tinker Elementary Schools
BidNet Direct - Connecticut
Other
CTStateOpenTODAY
Pure Storage Support 26-2
BidNet Direct - Connecticut
Other